Made-to-order cabinets from our Foshan factory - shipped duty-paid to the US, Canada & Australia +86 177 0868 3991

Collections

Kitchens Bath vanities Closets & wardrobes Mudroom & pantry Laundry rooms Home office Stainless steel Lacquered fronts Veneer & oak Oakline Flatstone Fluted

Projects

All projects

Solutions

How we work Cabinet options OEM / ODM Commercial & hospitality Dealers & wholesale

By market

United States Australia Africa Canada United Kingdom Saudi Arabia

By project

Apartments & multi-family Hotels & hospitality Villas & whole-home Importers & trade buyers

Company

About Factory & capacity Quality & warranty Blog

Guides

Importing & compliance Sourcing & QC Installation guide Contact Get a quote WhatsApp +86 177 0868 3991

Home / Blog / Opening a supply line

Guide · Dealer program

Opening a cabinet supply line: from first sample to repeat container.

A dealer line is only as good as its fourth order. One beautiful container is easy to source - the test is whether container four arrives with the same boards, the same edges, the same hardware and the same delivery date. This guide walks the four stages, with the written checkpoint at each one.

Finished kitchen run with white wall units and dark wood base units, staged before dispatch.
A dealer run, installed: white uppers over warm wood bases.
Curved door frames stacked in the workshop after forming
Arched frames off the line, still raw: the special shapes that eat a dealer MOQ.

What does a dealer actually need from a cabinet factory?

Trade press keeps reporting the same 2026 pattern: developers and dealers consolidating cabinet supply into fewer, more predictable partners - the shift is visible even among US-made lines, and the same consolidation logic is pulling serious dealers toward factory-direct sourcing. Behind that pattern sit four needs, in order of how often they break:

  • A repeatable spec. The board, edge banding and hardware are named in a document - brand and model number, not "same as last time."
  • A dependable lead time. Not the best case, the measured one, with a written production slot.
  • A warranty you can put in your customer's contract. Written terms from the bill of lading, not a verbal promise.
  • A sample stage that costs you nothing to learn from. You should be able to test colour, edge and hardware before any deposit.

Most wholesale kitchen cabinet relationships die between stage two and stage three: the sample was right, the first container was right, and the fourth one drifted. Every stage below ends with the checkpoint that prevents that.

How fast can you get a real number?

At Adam Cabinet the standard sequence is: send a floor plan, and within 1 business day (we work Monday to Friday, 9:00-18:00 Central Time) you get back a 3D layout plus a per-linear-foot quote. The number has to be a landed number to be useful - ours is quoted DDP: duty, clearance and final-mile delivery included. A standard matte kitchen (base + wall runs) is quoted per linear foot, DDP, against your final drawing.

Why the landed number matters: cabinets are one of the product categories where the tariff line is separate from the invoice price. On China-origin kitchens the layers are: a 25% Section 232 duty on kitchen cabinets and vanities, applying to entries on or after October 14, 2025, with the scheduled step-up to 50% now set for January 1, 2027 (Proclamation 11000, December 31, 2025); plus the antidumping and countervailing duty orders on wooden cabinets and vanities from China, in place since 2020 and confirmed to remain in place by the USITC's August 2025 sunset review, at rates that vary by exporter. The combined layer therefore depends on your supplier and the entry date, and your licensed broker is the authority on the current number for your HS code. A quote that stops at the factory dock forces you to price that risk yourself, every order.

The quote should also separate what the per-foot number includes from what it never does: base runs, wall runs and tall units are measured separately; countertops, appliances and in-field installation are not part of the cabinet line. A flat "per cabinet" price is not comparable to any of this - it stops meaning anything at the first corner or the first tall unit.

How do you lock in the sample - and the spec - before paying?

The sample stage is the only stage where you can be wrong cheaply, so it should have no minimum: one door, one carcase panel, one edge-banding detail, the hinge and runner you intend to use. Ours has no sample-stage minimum, and for lacquered finishes the painted sample ships with the first quote - colour approval happens on a physical board under your own light, not on a screen, which is where most finish disagreements are born and never properly resolved.

Then freeze the spec, because the spec is what the fourth container will be built from:

LineWhat "frozen" meansOurs, for reference
Carcase boardBrand, thickness and grade named - not a letter18mm E0-grade plywood, formaldehyde at or under 0.05 mg/m³ (GB/T 39600, test report no. SQ2405393); CARB Phase 2 under TÜV Rheinland, cert on request
Edge bandingThickness and adhesive type on every cut edge2mm PVB hot-melt, all cut edges
HardwareBrand and model, ratedBlum soft-close, 50,000-cycle rated; 35-45 kg runners per pair; single door up to 28 kg
ToleranceThe cutting spec in writing±0.5 mm
ColourPantone/RAL number plus approved physical sampleAny RAL, matte 5% to gloss 90%; custom colours from 500 door panels

That table is a one-page spec sheet, and it gets attached to the contract. From then on, "the same as before" is not a specification - anything changed is a new sample, in writing.

Full trial assembly of a production order before packing
Every order is trial-assembled in full before it is packed - this is the checkpoint that catches what photos cannot

What happens after the deposit?

The order of operations matters more than the percentage. The deposit comes to 40%, but the production slot is confirmed in writing first - you pay into a dated, written slot, never into a queue. From confirmed drawings, factory time on kitchens and vanities is 10-14 days (closets 12-16 days). During production you receive photo checkpoints at 24, 48 and 72 hours, and every order is trial-assembled in full before packing. If you want an independent set of eyes, SGS, Intertek or BV inspection is available on request - we schedule around it rather than discourage it.

Then the container does the part most quotes leave out of the number. Under DDP the transit window is inside the price: 18-22 days to the US West Coast and Vancouver, 32-40 days to the US East Coast, 15-20 days to Sydney. What to hold the factory to on arrival: damage claims are reported within 48 hours of delivery with photos and the order number, and the warranty terms sit in the contract from the bill of lading - 5 years on the plywood carcase, 2 years on door finishes, 5 years on hardware and workmanship. The on-time record on delivered programs is 98%; a dealer line is exactly where that number has to hold, because your customer's installer is on the other end of it.

Repeating kitchen specification across a 40-unit rental program
The Austin program: 40 units, one frozen spec, staged floor by floor

How do repeat orders stay identical?

They don't, by default - that is the part of this business that requires a system. The frozen spec sheet is the contract's reference, and every repeat order is produced against it line by line. Only what you sign off may change: a new colour added to the line, a new door style for a new project. Everything else - board, edge banding, hardware model, packaging, labelling - is locked, and a change without a signed-off sample is a defect, not a preference.

The proof case is a 40-unit rental program in Texas, delivered in 2025: one specification repeated across the building, production staged floor by floor against the site's schedule, so units landed as floors closed out rather than all at once. The project page shows the staging. That program was never a "first container" problem; it was a consistency problem, and consistency is what a dealer actually resells. The customer who bought a door from you in 2024 should get a matching door in 2027 - with the same edge, the same hinge, the same colour - or the line has quietly become a one-off supplier.

Which program terms matter more than the price?

Two wholesale kitchen cabinet partners quoted at the same per-foot number can be very different products - and the difference shows up in the terms, not the price. The terms below are the ones we would write down before the first deposit, and the current position on each:

TermGet it in writing as…Current position
MOQPer-style and per-order, separately - one number means nothing without its unitMixed kitchen orders from 1,500 sq ft; no sample-stage minimum
MixingWhich rooms and projects may share one containerKitchens + closets + vanities in one 40HQ count together
Packaging & labellingPer-room packing lists, unit labels, your brand under OEM/ODMIncluded; custom packaging and labelling per program
Lead timeFactory days from confirmed drawings, plus the DDP transit window10-14 days kitchens; 18-22 / 32-40 / 15-20 days DDP by region
WarrantyContract terms from the bill of lading5 years carcase · 2 years finishes · 5 years hardware and workmanship
ClaimsThe reporting window and evidence required48 hours, photos + order number
On-time recordMeasured across delivered programs98% on-time delivery; 120+ countries served

Price gets negotiated; these terms get built. A dealer who has the frozen spec, the written slot and the contractual warranty has a product that can be resold at a margin - everything else is just furniture with a long address.

What does the first 90 days look like?

WindowStageCheckpoint
Week 1-2Floor plan → 3D layout + per-foot quote; spec sheet draftedLanded number on the table; spec lines agreed
Week 3-5Sample stage: carcase panel, door, edge, hardware; colour approval on physical boardsApproved sample + frozen spec sheet signed
Week 6-8Deposit (40%) after written production slot; production 10-14 days; QC photos at 24/48/72 h; trial assembly72-hour photo set + trial-assembly photos accepted
Week 9-13DDP transit: 18-22 days West Coast, 32-40 East Coast, 15-20 Sydney48-hour damage claim window closed
Day 60-90Install feedback in; second spec batch drafted from what the field asked forRepeat order decision with a known, frozen reference

The pattern to notice: no stage is skipped to save time, because every "saved" week reappears later as a claim, a colour complaint or a mismatched door. Ninety days to a line you can actually resell is fast; a line that takes 40 days and drifts by order four is not.

FAQ

Do I need my own tooling or a house door profile to open a line?

No. The existing profiles - shaker, slab and fluted - run in your first container. A custom profile is an OEM/ODM program with its own sample stage, and the sample stage has no minimum.

What is the minimum first order?

Mixed kitchen orders start at 1,500 sq ft of cabinet footage, and kitchens, closets and vanities packed into one container count together. There is no minimum at the sample stage - see how MOQs actually work on a made-to-order line.

Who pays the import duty?

Under a duty-paid (DDP) line, the factory does - duty, clearance and final-mile are inside the per-foot number. China-origin cabinets carry additional duties that change over time; your licensed broker confirms the current rate on your HS code.

What happens if a unit is damaged in transit?

Report within 48 hours of delivery with photos and the order number. Warranty terms are in the contract from the bill of lading, so the claim path is contractual.

Can I sell under my own brand?

Yes - profiles, colours, packaging and labels under the OEM/ODM program: one container per program, custom colours from 500 door panels, no sample-stage minimum.

How do I verify the factory isn't subcontracting my order?

A 30-minute live video tour runs within the same week you ask. During production, photo checkpoints arrive at 24, 48 and 72 hours, and SGS, Intertek or BV inspection is available on request.

The short version

  • A dealer line is judged on the fourth container, not the first - the frozen spec sheet is what gets you there.
  • Every stage has a written checkpoint: 1-day landed quote, no-minimum sample, 40% deposit into a written slot, QC photos at 24/48/72 hours, 48-hour claim window.
  • Terms beat price: the 98% on-time record and the 5/2/5 written warranty are what you actually resell.

Send a floor plan. See the number on day one.

3D layout plus per-linear-foot quote within 1 business day - duty-paid, so the number is the number.

Part of the sourcing and QC guide series - the full cluster, in reading order.