Made-to-order cabinets from our Foshan factory - shipped duty-paid to the US, Canada & Australia +86 177 0868 3991

Collections

Kitchens Bath vanities Closets & wardrobes Mudroom & pantry Laundry rooms Home office Stainless steel Lacquered fronts Veneer & oak Oakline Flatstone Fluted

Projects

All projects

Solutions

How we work Cabinet options OEM / ODM Commercial & hospitality Dealers & wholesale

By market

United States Australia Africa Canada United Kingdom Saudi Arabia

By project

Apartments & multi-family Hotels & hospitality Villas & whole-home Importers & trade buyers

Company

About Factory & capacity Quality & warranty Blog

Guides

Importing & compliance Sourcing & QC Installation guide Contact Get a quote WhatsApp +86 177 0868 3991

Home / How we work

From your floor plan to your delivery date.

One document flow, three checkpoints, and numbers you can hold us to. This is the exact path your order takes after you send the plan.

24 hQUOTE TURNAROUND
3D + 2DDRAWINGS INCLUDED
10-14DAY FACTORY LEAD
3QC PHOTO CHECKS
DDPUS · CA · AU

Step 01 - Share

Send the plan. Any plan.

A CAD floor plan is the fastest input, but a measured sketch, phone photos of the room, a photo of a paper drawing or a simple room list all start the clock. The same message that carries your number tells you what is still missing.

  • Floor plan (PDF / JPG)fastest path - exact linear feet
  • Measured sketchwe clean it into shop drawings
  • Room photosworks for remodels with no drawings
  • Room list onlywe start from a template and confirm
A production drawing from a delivered whole-house order
This is what a room list becomes: one line per bay, one finish code per room, every opening called out. Send the rougher version - we clean it into shop drawings.

What comes back within one business day: the 3D layout, the per-linear-foot number, and the short list of details we still need from you. No account, no deposit to start.

Step 02 - Confirm

The drawings you approve are the drawings we build.

The design library publishes 480 of these packs, so you can see what an approved set actually contains.

Once the design is right, it locks into production documents: 2D shop drawings for every bay, 3D views of the full room, and a production list with one finish code per room. Revisions are free until you sign the set - and the production slot is confirmed in writing before any deposit is taken.

Robotic loading arms moving panels onto the CNC line in Foshan
Your approved drawing becomes machine code - every hole position, reveal and edge-band run is programmed before the first cut.
  • Deposit40%, after the slot letter
  • Production listone line per bay, one finish code per room
  • Revisionsfree until you approve the set
  • Lacquered runspainted sample ships with the first quote

Step 03 - Build & ship

Ten stages, three photo checkpoints, one delivery date.

Your run moves through ten production stages - cutting, edge banding, finishing, hardware, trial assembly, packing - with photo reports at 24, 48 and 72 hours. The entire run is trial-assembled on the bench before packing; the run, not a sample of it. The full walk through the line is on the factory page.

Full run of oak cabinet bases trial-assembled on the factory floor
72 h - trial assembly Joints, reveals and every hinge cycled as a system before the box is closed.
Flat-packed panel bundles strapped in a wooden crate frame
Packing Numbered, corner-protected boxes with the install manual in every kit.

Then the container leaves duty-paid - ocean freight, import duties, customs clearance and drayage inside the number, with the delivery date scheduled 3-7 days before the truck rolls.

That is the number behind the South Africa villa and the Zambia grand villa - both delivered inland, duties and drayage included, on a date that was written down before the container sailed.

Timelines

The dates we commit, in writing.

StageCommitmentNotes
Quote + 3D layoutwithin 1 business day of the planFree, no deposit to start
Production slotconfirmed in writing first40% deposit after the slot letter
Factory production10-14 days kitchens / vanities · 12-16 days closetsQC photos at 24 / 48 / 72 h; full-run trial assembly
US West Coast + Vancouver18-22 days, DDPFreight, duty and drayage inside
US East Coast32-40 days, DDPQuoted per port before you pay
Sydney15-20 days, DDPQuoted per port before you pay
Install1.5-2 days, two-person crew20-linear-foot kitchen; vetted partners on request

Peak season

Finished kitchen installed on site, ready for handover
The container the dates refer to: numbered, corner-protected crates under one booking. The delivery date is scheduled 3-7 days before the truck rolls.
(Aug - Oct, ahead of the US spring build) books out first - the slot letter is what makes the date.

FAQ

The factory window is 12-16 days; the whole door-to-dock span is longer. How long a custom cabinet order actually takes breaks the timeline into its parts.

The process, in plain answers.

What exactly do you send back after I email my plan?
Three things in one message: the 3D layout of the room, the per-linear-foot number with freight and duty as separate line items, and the short list of details we still need. Most plans come back within the working day.
Can I change the design after I pay the deposit?
Yes, while the run is still in the drawing stage - revisions are free until the production list is locked. After cutting starts, changes are priced as a formal change order with a number in writing before any work happens.
What if a panel arrives damaged?
Report it within 48 hours of delivery with photos and the order number. The box is numbered, so we know exactly which bay was hit - replacement panels ship on the next container, and the warranty terms on the quality page cover the rest.
Do you do hotels and multi-unit projects?
Yes - staged delivery by floor or by wing, one document per unit type, and a repeated module so unit 40 is priced and built exactly like unit 1. See the hotel and apartment projects in the record.
Can I visit, or see the line before I order?
A 30-minute video walkthrough of the showroom and your production slot is standard before the first order; in-person visits in Foshan work by appointment. Most buyers do the video call in the same week they send the plan.

Send the plan today.

The 3D layout and the per-linear-foot number come back within one business day - free, with no deposit to start.

Further reading - the four duty layers on one container of cabinets (Section 232, Section 301, AD/CVD by exporter) with a worked 40HQ landed-cost table, in the guide to cabinet import tariffs.

Repeat orders, without drift - the eight blocks that belong in a frozen cabinet spec sheet (board grade, banding, hinge and slide model numbers, tolerances) and a one-page template you can copy are in the frozen-spec guide.

Further reading - two quotes only become comparable once the same six lines are written in both columns; the normalisation table, the unit conventions that hide cost and the five questions to send back are in how to compare two cabinet quotations.