Home / Factory
The factory your cabinets come from.
CNC lines, finishing room, trial-assembly benches and an export logistics desk - all under one roof in Foshan. This is what your order walks through, in order.
Production
Ten stages, in this order.
Your boards enter at stage 1 and leave stage 10 as a numbered, pre-drilled, flat-packed kit. Here is the full walk.

1 · Raw materials
E0-grade plywood board, graded and acclimatized before it touches a machine.

2 · Cutting
CNC panel saw + router, tolerance ±0.5mm.

3 · Edge banding
Hot-melt PVB edge on every cut edge - the part buyers feel and the part that leaks formaldehyde if it's cheap.

4 · Drilling & machining
Five-axis drilling for all hardware; every hole position is programmed from your approved drawing.

5 · Finishing & drying
Matte or satin coats, dried in controlled temperature and hand-checked under raking light - every finish we ship is one of the 49 boards on the wall.

6 · Hardware fitting
Blum hinges, runners and push-open catches fitted and cycled before the box is closed (DTC on request).

7 · Trial assembly
Every run - not a sample of it - is assembled once on the bench. Joints, reveals and hardware checked as a system.

8 · Packing
Flat-pack in numbered boxes, corner-protected, palletized and strapped for container loading.
Stages 9-10 (loading & export documentation) are covered on the quality & warranty page under the shipping SOP.
Capacity & lead times
What we can commit, in writing.
| Line | Monthly capacity | Standard lead | Notes |
|---|---|---|---|
| Kitchen runs | ~60,000 linear feet | 10-14 days | Plywood box, all collections |
| Vanities | ~12,000 units | 10-14 days | Floating & floor-standing |
| Closets / wardrobes | ~4,000 systems | 12-16 days | Walk-in & built-in |
| Commercial / hotel | By project | Quoted per project | Staged delivery available |
Peak season (Aug - Oct, ahead of US spring build) books out first. We confirm the production slot in writing before your deposit is taken.
Hardware
Fittings, cycled on the line.
Hardware is fitted at the 48-hour checkpoint and cycled at the 72-hour trial assembly: every door opened and closed before it is marked for packing. That is where a bad hinge shows up - on our bench, not on your site.
- HingesBlum soft-close, 50,000-cycle rated (DTC available)
- RunnersFull-extension, 35-45 kg per pair
- Paint3 colour + 2 clear coats, 60°C × 45 min cure
- Trial assemblyEvery order, at the 72-hour gate
Showroom
See and touch, before or instead of visiting.
A whole-house showroom - 30,000㎡ across kitchens, closets, vanities and entry runs in our current collections - used for video tours, material selection and client entertainment.
- In person
Foshan, by appointment
- Video tour30 min, same week
- Material wallAll finishes, live samples
FAQ
Capacity, lead times and the line, in plain answers.
Where is the factory and how big is it?
What is the standard factory lead time?
How many stages does an order pass through?
What is the real monthly capacity?
What happens when peak season books out?
Walk the floor with us 30 minutes, on your schedule.
Showroom, production line and a live sample of your own layout.
Buying from a distance - the nine checks that hold up from a desk (line ownership, capacity, board reports, banding, hardware traceability, trial assembly, photo gates) are set out in the remote factory-verification guide.
At program scale - repeated units, per-unit crating, staged delivery to the fit-out calendar and the 48-hour damage window in the contract, worked through three published programs: standardising cabinet specs across 40+ units.