Made-to-order cabinets from our Foshan factory - shipped duty-paid to the US, Canada & Australia +86 177 0868 3991

Collections

Kitchens Bath vanities Closets & wardrobes Mudroom & pantry Laundry rooms Home office Stainless steel Lacquered fronts Veneer & oak Oakline Flatstone Fluted

Projects

All projects

Solutions

How we work Cabinet options OEM / ODM Commercial & hospitality Dealers & wholesale

By market

United States Australia Africa Canada United Kingdom Saudi Arabia

By project

Apartments & multi-family Hotels & hospitality Villas & whole-home Importers & trade buyers

Company

About Factory & capacity Quality & warranty Blog

Guides

Importing & compliance Sourcing & QC Installation guide Contact Get a quote WhatsApp +86 177 0868 3991

Home / Kitchen cabinets / Assembled cabinets

The pre-built line

Assembled kitchen cabinets, set in one pass.

Assembled kitchen cabinets leave the factory built: carcass finished, doors hung, hardware adjusted, then crated to arrive set-ready. The crew sets and levels instead of assembling - and the trade you make for that is container yield.

The trade, in one table

What you give up, and what you buy.

The same table as the comparison guide, verbatim:

FactorFlat-pack (RTA)Assembled (pre-built)
Container yieldMore per container - panels nestFewer per container - ships volume
Freight per linear footLower (dense load)Higher (shipping air)
Damage in transitCorner-protected panels, one bay at a timeBox-level risk, dents show
On-site laborAssemble - 1.5-2 d, two-person crewSet + level - faster, heavier
Final fitAdjusted on site to the roomMust fit as shipped
Best forMost orders, non-standard roomsTight schedules, show-ready arrival

The flat-pack route in detail, with the measured crate plan: ready-to-assemble cabinets.

Where it wins

Three sites that should order assembled.

Assembled kitchen cabinets are the format for schedules where the install crew is the constraint - not the budget line.

Schedule

Tight completion dates

Set and level in one pass; the room reaches show-ready sooner than a flat-pack install of the same run.

Labour

Scarce or expensive crews

Where a fitter costs more per hour than the freight difference, buying the assembly at the factory is the cheaper hour.

Handover

Show-ready arrival

Units arrive set-ready for a handover, a viewing or a staged opening instead of a build week.

Same gates either way

The QC does not change with the crate.

Assembled kitchen cabinets run the same ten factory stages as a flat-pack order: 18mm E0-grade plywood cut to the drawings at ±0.5 mm, 2mm PVB hot-melt banding on every cut edge, Blum soft-close hinges rated to 50,000 cycles, and trial assembly before the deposit is banked.

Because the unit is built before it travels, the trial assembly and the crating are the same operation: it is built once on the floor, checked against the drawings, photographed at the 24/48/72-hour gates, then packed with its own number. If something does arrive wrong, the 48-hour window and the packing list identify the part - and the nine verification checks describe the evidence trail behind it.

Pre-built cabinet units in a delivered kitchen run

The box, the edge, the hardware

The specification is identical.

Only the packing format changes. Board, banding, hardware, reveal tolerance and QC gates are the same on an assembled order as on a flat-pack one.

  • Board18mm E0 plywood, ≤0.05 mg/m3 (GB/T 39600)
  • Edge2mm PVB hot-melt on every cut edge
  • HardwareBlum soft-close, 50,000-cycle rated
  • RevealChecked to ±0.5 mm before crating

The full line-by-line specification is on quality & warranty.

FAQ

Assembled kitchen cabinets, asked straight.

What does assembled mean in practice?
The boxes leave the factory built - carcass assembled, doors hung, hardware fitted, drawer fronts adjusted - and crated so each unit arrives set-ready. On site the crew sets and levels instead of assembling, which is faster and heavier.
Is an assembled order more expensive?
Not in the unit price, but in the freight. Pre-built units ship volume, so fewer of them fit per container and the cost per linear foot rises. Flat-pack trades site labour for container yield; assembled trades container yield for site labour - which one wins depends on what labour costs at your site.
How much site time does it save?
A two-person crew takes 1.5-2 days on a standard 20-linear-foot kitchen in flat-pack. Assembled units set in place instead, so the work is setting and levelling rather than assembly - and the room reaches show-ready sooner.
Does an assembled order still get trial assembly?
Yes - every order is built once on the factory floor, checked against the drawings, photographed at the 24/48/72-hour gates and then packed. The gates do not change with the packing format.
What if a unit arrives damaged?
Report it within 48 hours of delivery with photos and the order number. Every box is numbered, so the affected part is identified from the packing list and re-made to the frozen spec rather than to a description.
Which markets suit assembled cabinets?
Markets where site labour is scarce, slow, or expensive relative to freight - and projects with a hard completion date. Where a competent crew is available and cheap, flat-pack usually lands cheaper; where the schedule is the constraint, assembled buys days.

Once the crate is on site: the cabinet installation guide - the tool list, the hardware in the bag and the numbered sequence.

Tell us which constraint is binding.

Send the plan and say whether the schedule or the budget is tighter. The quote names both routes - flat-pack and assembled - on the same specification.