Made-to-order cabinets from our Foshan factory - shipped duty-paid to the US, Canada & Australia +86 177 0868 3991

Collections

Kitchens Bath vanities Closets & wardrobes Mudroom & pantry Laundry rooms Home office Stainless steel Lacquered fronts Veneer & oak Oakline Flatstone Fluted

Projects

All projects

Solutions

How we work Cabinet options OEM / ODM Commercial & hospitality Dealers & wholesale

By market

United States Australia Africa Canada United Kingdom Saudi Arabia

By project

Apartments & multi-family Hotels & hospitality Villas & whole-home Importers & trade buyers

Company

About Factory & capacity Quality & warranty Blog

Guides

Importing & compliance Sourcing & QC Installation guide Contact Get a quote WhatsApp +86 177 0868 3991

Home / Kitchen cabinets / Ready-to-assemble

The flat-pack line

Ready-to-assemble cabinets, numbered to the bay.

A ready-to-assemble kitchen leaves the line flat: parts cut to your drawings, drilled and edge-banded, packed into numbered boxes by bay, assembled at your site in 1.5-2 days. Same board, same edge, same hardware as a pre-built order - a different route across the ocean.

The format

What ready-to-assemble actually means.

Flat-pack is a packing decision, not a build standard. Your kitchen runs the same ten stages as a pre-built order: 18mm E0-grade plywood cut to the drawings at ±0.5 mm, 2mm PVB hot-melt banding on every cut edge, Blum soft-close hinges rated at 50,000 cycles, trial assembly before the 40% deposit.

The difference is the last step. The boxes ship corner-protected and numbered by bay, so the crew opens bay 1, fits bay 1, then moves on - and the kitchen is adjusted on site to the room, not forced to fit as shipped.

The full comparison - container yield, freight, damage, labour, fit - is costed in the flat-pack vs assembled guide.

Cabinet modules and numbered flat-pack boxes on the assembly line in Foshan

Why it matters

The difference, in one table.

FactorFlat-pack (RTA)Assembled (pre-built)
Container yieldMore per container - panels nestFewer per container - ships volume
Freight per linear footLower (dense load)Higher (shipping air)
Damage in transitCorner-protected panels, one bay at a timeBox-level risk, dents show
On-site laborAssemble - 1.5-2 d, two-person crewSet + level - faster, heavier
Final fitAdjusted on site to the roomMust fit as shipped
Best forMost orders, non-standard roomsTight schedules, show-ready arrival

Numbers from a packing list

One measured order, crate by crate.

Not a sample kit - a delivered program: a kitchen plus fourteen wardrobe sheets, packed and crated in one export order. Every row is the total line of its own sheet in the packing list, and the total is what the container was entered with.

ComponentPiecesVolume (m3)
Kitchen modules56262.56
Wardrobe modules (14 sheets)41923.42
Wood crating218.62
Hardware packs100.17
Total1,01294.77

A flat-pack program is a list of counted pieces, not an estimate of volume.

The packing standard

How it leaves the line.

Wooden crate protecting flat-pack cabinet panels

Wooden crates

Panels crated so a stack cannot shift; corner protection on the edges that take knocks.

Cabinet crates on a bottom wood pallet ready for the container

Pallets

Bottom wood pallets under the crates - forked once, moved once, no hand-stacking on the dock.

Crated cabinet modules loaded into the export container at the factory

Loading

The container loaded bay by bay against the packing list, before the seal is closed.

Countertop slabs crated separately on their own pallet

Stone in its own crate

Countertops crate separately on their own pallet, so stone and cabinets do not share risk.

The last step

At your site, not ours.

A two-person crew takes 1.5-2 days on a standard 20-linear-foot kitchen. Larger runs scale with linear feet; every box arrives with its install manual and the hardware pre-sorted.

Numbered, corner-protected boxes under crating, insured in transit and included inside a DDP price. Report any damage within 48 hours with photos and the order number - the box is numbered, so we know exactly which bay was affected.

The sequence, gates and photo evidence it runs through: the ten stages, deposit to delivery. The document the boxes are packed against: the frozen spec.

Shrink-wrapped flat-pack cabinet loads strapped on pallets inside the export container

FAQ

The flat-pack format, asked straight.

What does ready-to-assemble mean in practice?
The parts are cut to your drawings on the same CNC path as a pre-built order, drilled, edge-banded and packed flat into numbered boxes by bay. The flat-pack step happens at your site: a two-person crew takes 1.5-2 days on a standard 20-linear-foot kitchen, with the install manual in every box and the hardware pre-sorted.
Can I mix flat-pack with pre-built pieces?
Yes - the same drawings can ship flat-pack or pre-built. Pre-built boxes arrive show-ready and set in place; the trade is container yield and freight, because pre-built units ship volume. Most orders ship flat-pack; a tight install window can justify the pre-built leg.
What is the board in a flat-pack order?
18mm E0-grade plywood, formaldehyde at or below 0.05 mg/m3 per GB/T 39600, report SQ2405393, with 2mm PVB hot-melt banding on every cut edge. Same board as a pre-built order - the packing format changes, the spec does not.
What happens if a panel arrives damaged?
Report it within 48 hours with photos and the order number. Every box is numbered to the bay, so we know exactly which bay was affected - and which panels to re-cut and re-ship under the same frozen spec.
Do you pack the stone and hardware with the kitchen?
Hardware ships with the boxes, pre-sorted by bay. Stone runs in its own crate on its own pallet, crated separately from the cabinet modules, so stone and cabinets do not take each other's risk in transit.
Is ready-to-assemble a lower-grade option?
No - it is the standard format. The spec is identical to a pre-built order: same board, same edge, same hardware. Flat-pack is how most kitchens cross an ocean, and the trade it buys is freight, not quality.

Once the crate is on site: the cabinet installation guide - the tool list, the hardware in the bag and the numbered sequence.

Your measured order, one floor plan away.

Send the plan. The quote comes with the packing plan - bay by bay, piece by piece, the way the container will be entered.

How the flat-pack decision is costed: flat-pack vs assembled. Start with a painted panel before the boxes: door samples. Up one level: kitchen cabinets.top 10 RTA cabinet suppliers in China.